 City of Gatesville City-County Airport Runway 17-35 Improvements
 Client: City of Gatesville
 Project Manager: David Marek, PE
 Date: 01/01/06

Work Order 9813

The City of Gatesville and Coryell County contracted with The Wallace Group to perform engineering/surveying services to upgrade the existing runway to be in compliance with current FAA guidelines. The current 50-foot wide runway is being expanded to 75 feet and lengthened from 3,400 feet to 4,000 feet.

This project was based on a feasibility study completed by The Wallace Group that analyzed six options to extend the current runway. Different length extensions for each end were looked at along with the associated costs. The final recommendation was to have both north and south ends extended by 300 feet.

 
     
 