Work Order 8110 In conjunction with Ron Morrison, P.E., TCFM, the Wallace Group conducted a floodplain study of Upper Waco Creek to evaluate drainage improvement alternatives necessary to alleviate flooding conditions for a proposed Target Greatland site. Originally, this site had been the home of Lake Air Mall which had experienced flooding on several occasions. The scope of work included:
The Wallace Group utilized a hydrologic model from a previous study that Ron Morrison had prepared for a development downstream of the Target site. A HEC-RAS model was then prepared for Upper Waco Creek to determine the 100-year water surface profile. Various alternatives were analyzed before the recommended solution was finalized. The recommended solution included overland conveyance improvements coupled with an underground, multiple box culvert system. Target’s engineers were able to incorporate this solution into their development plans. |
||||||||||||
|
Corporate HQ 200 West Highway 6 Suite 620 P.O. Box 22007 Waco, TX 76712 News About Us Project Profiles Links Career Opportunities Contact Us |
||||||||||||