 City of Temple Bellaire North Drainage Improvements
 Client: City of Temple
 Project Manager: David Marek, PE
 Date: 01/01/01

Work Order 9333

This project was the result of a prior study completed by the Wallace Group examining several areas in Temple that were experiencing drainage problems. Due to the findings of the report, design of a separate drainage system to accommodate the convention center drainage and expansion of the existing drainage system along Van Pelt to relieve surface runoff was completed.
 
     
 